Sector F-14 Islamabad: 120-Foot Roads Advance

Sector F-14 Islamabad is advancing. Initial observations show widespread earthmoving, land leveling, and demarcation of key arterial roads for heavy transit and direct access, linking the sector and sub-sectors.

Roads

  • West Markaz Road: 120-foot central artery; primary commercial/residential axis within the sector.
  • Dilzak Road: 120-foot connective corridor; directly intersects West Markaz Road at central junction.
  • Both: prepared wide earth beds, extensive earthwork and ground preparation, framework for future paving and utility installations.

Progress

Sub-sectors are at varying initial ground-forming stages:

  • F-14/3: immediately beside West Markaz Road; preliminary street cutting and terrain preparation; early alignments emerging as machinery grades.
  • F-14/4: significant ground clearance and earthwork; key focus area.
  • F-14/1 and F-14/2: adjoining zones in the sector plan; cohesive grid with F-14/3 and F-14/4.

Wide-scale earthwork continues: heavy machinery cuts high terrain and fills depressions for level streets and residential zones; 120-foot primary roadbeds are visibly carved, connecting Sector F-14 pockets.

کیا آپ رئیل اسٹیٹ مارکیٹ کے تازہ ترین رجحانات سے باخبر رہنا چاہتے ہیں؟
محفوظ اور منافع بخش سرمایہ کاری کے فیصلوں کے لیے ہمارا آفیشل واٹس ایپ چینل آج ہی فالو کریں! ہم آپ تک پہنچاتے ہیں مارکیٹ کی درست ترین معلومات اور بروقت تجزیات۔ 📈✨

👇 ابھی ہمارے چینل کا حصہ بنیں:
https://whatsapp.com/channel/0029Va8D7O511ulLB3FgCK0u

Choudry Mujahid Yasin (CMY ) Owner of LahoreRealEstate.Com
https://wa.me/923224929992 Direct message to me now