Tag: CDA DHA Project

  • DHA Margalla Enclave Development Progress Report

    DHA Margalla Enclave, a joint venture of the Capital Development Authority (CDA) and the Defence Housing Authority (DHA), is moving quickly from plan to ground reality. A recent site visit confirms visible headway in civil works, sector layouts, road networks, and key milestones across this prime residential and commercial project.

    Main boulevard and utilities: Civil works continue around the clock along the entry boulevard. Primary avenues are already paved, marked, and fitted with street lighting poles. Earthworks still raise dust, but the main transport corridors are clearly formed for construction vehicles and future residents. CDA underground electricity is in place along key routes, shown by ground-level utility control boxes, and elevated water storage reservoirs have finished structural work to support dependable supply.

    Residential sectors: The master plan separates housing into ME-1, ME-2, ME-3, and ME-4.

    • ME-2: Beside the main boulevard, this sector shows heavy earth grading, leveled ground, and finished service lanes. Plot possession is set for July 2027.
    • ME-3: Higher terrain makes this a premium zone, with open views over the Margalla Hills, one-kanal residential plots, and boundaries along major new link roads.
    • ME-1 and ME-4: Ground leveling, plot demarcation, and utility pipeline work are advancing in step with the overall schedule.

    Lake District commercial zone: Commercial activity is focused on the Lake District, where heavy machinery and drilling rigs are preparing ground for high-density commercial complexes and modern civic amenities. The master plan lists waterfront areas (Lake-1 and Lake-2), a five-star hotel, the Jacaranda Family Club, sports complexes, green parks, and the Space X Center. Foundation and site work point to major structural change within the next 12 to 18 months.

    Connectivity:

    • Power Avenue Road: A showcase boulevard running between ME-2 and ME-3, with wide asphalt lanes, a central green belt, direct links to streets such as Nishan Avenue, and hill views.
    • Park Road Interchange: Entry is served by the newly operational Park Road flyover and underpass. The approach road toward Khayaban-e-Azadi is being widened for traffic from DHA Margalla Enclave, Bahria Enclave, and Park View City; the final expansion stretch is targeted within 15 to 20 days.
    • Future tunnel: Plans include an underpass tunnel through the hillside toward the Convention Centre area.

    Location and travel times: The site sits about five minutes from the Convention Centre and Serena Hotel under normal driving conditions, with smooth routes to Kuri Road and Park Road. With civil works, utilities, road widening, and commercial ground preparation advancing together, DHA Margalla Enclave remains on track toward its scheduled delivery phases.

    کیا آپ رئیل اسٹیٹ مارکیٹ کے تازہ ترین رجحانات سے باخبر رہنا چاہتے ہیں؟
    محفوظ اور منافع بخش سرمایہ کاری کے فیصلوں کے لیے ہمارا آفیشل واٹس ایپ چینل آج ہی فالو کریں! ہم آپ تک پہنچاتے ہیں مارکیٹ کی درست ترین معلومات اور بروقت تجزیات۔ 📈✨

    👇 ابھی ہمارے چینل کا حصہ بنیں:
    https://whatsapp.com/channel/0029Va8D7O511ulLB3FgCK0u

    Choudry Mujahid Yasin (CMY ) Owner of LahoreRealEstate.Com
    https://wa.me/923224929992 Direct message to me now