Tag: Al Rehman Garden

  • Al Rehman Garden Phase 7: Development Across Blocks A-D

    Al Rehman Garden Phase 7 shows active on-ground development across residential, commercial, and infrastructure sectors as of the latest on-site survey. Main Entrance and Community Aesthetics Entrance: wide, paved main boulevard lined with decorative street poles, median beds, ornamental urns, palm trees, and a security checkpoint. Key intersections display architectural monuments and roundabouts with stone masonry and regularly watered green belts. Admin office: central administrative head office with a white circular facade and arched architecture near the entry, commercial storefronts, and developer offices. Established Sectors: Blocks A, B, and Haider Block Early developed sectors, including Block A, Block B, Haider Block, and adjacent sectors, show advanced habitation and structural readiness: Underground electrical wiring throughout developed sectors. Active multi-story construction: brickwork, concrete slab casting, and reinforced damp-proofing at the foundation level. Inhabited homes: modern houses serviced by paved asphalt roads, curbs, and street lighting. Green parks, demarcated open spaces; Block B features an operational white grand mosque. Commercial zones: active retail structures and multi-story business premises under development. Block A Extension and Commercial Reserves Features clear demarcations between residential sectors and commercial avenues, along with designated land for educational facilities, including a planned site for The Lahore City School. Commercial frontages measure two to four marlas along secondary access roads and wide boulevards. Infrastructure Expansion in Block D Development spans sectors D1, D2, D3, and D4: Road tracing and compaction: motor graders and vibratory compactors prepare sub-base surfaces. Signboards: Block D1 Street 01, Street 10, and other directional signs at intersections mark plot boundaries and street alignments. Base layer: crushed stone and aggregate hauled by tractor-trailers, graded, and water-compacted for asphalt surfacing. Sewerage alignment: subterranean drainage lines installed; concrete manhole covers brought to ground level for final road surfacing. Earthworks and Road Preparation in Block C Covering sectors C1, C2, and C3: Underground drainage: heavy excavators level trenches and install drainage infrastructure along perimeters and street corridors. Sub-base preparation: crushed stone aggregate unloaded, with graders and rollers leveling corridors into uniform roadbeds. Future road links connect internal sector routes to government-access roads and external boundaries. Throughout Blocks C and D, central green medians along wide avenues have been filled with topsoil in preparation for landscaping, curbs, and paved footpaths once asphalt carpet laying commences.

    کیا آپ رئیل اسٹیٹ مارکیٹ کے تازہ ترین رجحانات سے باخبر رہنا چاہتے ہیں؟
    محفوظ اور منافع بخش سرمایہ کاری کے فیصلوں کے لیے ہمارا آفیشل واٹس ایپ چینل آج ہی فالو کریں! ہم آپ تک پہنچاتے ہیں مارکیٹ کی درست ترین معلومات اور بروقت تجزیات۔ 📈✨

    👇 ابھی ہمارے چینل کا حصہ بنیں:
    https://whatsapp.com/channel/0029Va8D7O511ulLB3FgCK0u

    Choudry Mujahid Yasin (CMY ) Owner of LahoreRealEstate.Com
    https://wa.me/923224929992 Direct message to me now